China Marine Economy Expo 2019 - FENG-YI

China Marine Economy Expo 2019

The exhibition on 14th-17th, Octorber 2019 focused on showcasing the overall ...

The exhibition on 14th-17th, Octorber 2019 focused on showcasing the overall development of China’s marine economy over the past seven decades and the main achievements in marine high-tech and equipments both  at home and abroad. At the meantime, the organizer will also gather oil& gas  companies, oceanic resource developers, marine technical service providers, marine  equipment manufacturers, shipbuilders, and research institutes to  participate, presenting the most up-to-date technologies of global marine  industry.

This exhibition designed FYL  200pcs Kinetic winch model DLB2-9 9m lifting stroke distance and model DLB-G20 20cm LED Balls. Creating an unique and spectacular visual sense.

Brief Introduction of the EXPO: Ocean is a strategic place for high-quality development, and marine economy has become an important part of China’s economy. In order to better promote the high-quality development of marine economy, promote international cooperation in marine economy, and show the achievements of China’s marine economy development, the China marine economy Expo, jointly organized by the Ministry of natural resources, Guangdong Provincial People’s government and Shenzhen Municipal People’s government, will be held in Shenzhen Convention and Exhibition Center from October 15 to 17, 2019.

With the theme of “blue opportunity, create the future together”, the Expo focuses on scientific and technological innovation, and sets up three exhibition sections, namely marine resources development and marine engineering equipment, ship and port shipping, and marine science and technology, with an exhibition area of 37500 square meters. During the same period, the Expo will hold the main forum of “building a marine life transport community”, as well as high-end dialogue, achievement release, and exhibition Business promotion and many other supporting activities.

Recommended for you
US New York -A Lighting Revolution at the Childish Gambino’s The New Would Tour-Dynamic Bar
US New York -A Lighting Revolution at the Childish Gambino’s The New Would Tour-Dynamic Bar
South Korea Seoul -Got7 concert-Dynamic Bar
South Korea Seoul -Got7 concert-Dynamic Bar
Beijing China-CCTV 2019 China Music Awards-Dynamic Bar
Beijing China-CCTV 2019 China Music Awards-Dynamic Bar
South Korea-BTS's "Boy with Luv" performance-Dynamic Bars
South Korea-BTS's "Boy with Luv" performance-Dynamic Bars
Prdoucts Categories
FAQ
Products
The lamp does not light up. What should I check?

Troubleshoot in 4 steps:

1. Power Supply: Confirm the input voltage matches AC 200V~240V/50~60Hz; check if the power cable is securely connected and the switch is on.

2. Cooling Period: Ensure the fixture has cooled for 20 minutes after previous use (mandatory cooling to prevent overheat damage).

3. DMX Signal: If in DMX mode, verify the controller is sending "Shutter On" (CH6: 252-255) and "Dimming" (CH7: 100-255) signals.

4. Internal Wiring: If above checks pass, contact after-sales to inspect internal connections (e.g., lamp holder, driver board) for loose or burned components.

How to set the DMX starting address via the panel?

Follow these steps:

1. Press "Left" (multiple times if needed) to return to the main interface.

2. Press "Up/Down" to select "Settings", then press "OK" to enter.

3. Select "DMX Address" and press "OK" to enter edit mode.

4. Adjust the hundreds digit (e.g., 2 for address 286) with "Up/Down", press "OK" to confirm; repeat for tens (8) and units (6) digits.

5. Press "OK" again to save the address (e.g., A286) and exit edit mode.

Logistics Services
Can on-site installation services be provided? How is the installation fee calculated?

On-site installation services are supported, and the fee is calculated based on the installation difficulty and region:

▪ Regular installation (e.g., bar PAR lights, front lights in small studios): 50-100 RMB/unit in prefecture-level cities and above, 80-150 RMB/unit in county-level regions.

▪ Large-scale installation (e.g., elevating lights in stadiums, moving head light groups for music festivals): Quoted based on the overall project (including travel expenses of installers and tool usage fees). Specific details require providing the installation site floor plan and the number of lights, and the engineering team will formulate a plan before quoting.

What logistics method is used by default for products? What is the delivery time for different regions in China?

Dedicated line logistics (e.g., Anneng, Best Express) is used by default. Express delivery (e.g., SF Express, JD Express) or full-truck transportation can also be arranged according to customer needs. Delivery time:

▪ East China/South China/Central China: 3-5 days.

▪ North China/Southwest China: 5-7 days.

▪ Northeast China/Northwest China: 7-10 days.

▪ Remote areas (e.g., Xinjiang, Tibet): 10-15 days, with an additional remote area freight charge (calculated by weight, specific details to be confirmed with the logistics department).

Want to learn more about the latest updates?

Have questions or ready to illuminate your project? Reach out to our expert team today.

Please enter your name not exceed 100 characters
The email format is not correct or exceed 100 characters, Please reenter!
Please enter a valid phone number!
Please enter your field_1233 not exceed 150 characters
Please select What you're interested in
Please enter your content not exceed 3000 characters

Rest assured that your privacy is important to us, and all information provided will be handled with the utmost confidentiality.

By clicking "Send your message," I agree to your processing my personal data.
To see how to withdraw your consent, how to control your personal data, and how we process it, please see our Privacy Policy and Terms of Use.

Contact customer service

How can we help?

Hi,

We value your needs and feedback. For any inquiries, contact us—we're here to help with expert support. Fill in the details below, and our team will get back to you promptly.

×
Please enter your name not exceed 100 characters
The email format is not correct or exceed 100 characters, Please reenter!
Please enter a valid phone number!
Please enter your field_1233 not exceed 150 characters
Please select What you're interested in
Please enter your content not exceed 3000 characters

Get a free quote

Hi,

Call us to discuss more on your own project!

×
Please enter your name not exceed 100 characters
The email format is not correct or exceed 100 characters, Please reenter!
Please enter a valid phone number!
Please enter your field_1233 not exceed 150 characters
Please select What you're interested in
Please enter your content not exceed 3000 characters

Get the solution

Hi,

Call us to discuss more on your own project!

×
Please enter your name not exceed 100 characters
The email format is not correct or exceed 100 characters, Please reenter!
Please enter a valid phone number!
Please enter your field_1233 not exceed 150 characters
Please select What you're interested in
Please enter your content not exceed 3000 characters

Send my request

Hi,

Call us to discuss more on your own project!

×
Please enter your name not exceed 100 characters
The email format is not correct or exceed 100 characters, Please reenter!
Please enter a valid phone number!
Please enter your field_1233 not exceed 150 characters
Please select What you're interested in
Please enter your content not exceed 3000 characters